Resumen (inglés):
The special requirements of this part apply to temporary installations for construction and demolition sites during the period of the construction or demolition work, including for example the following:
- construction work of new buildings;
- repair, alteration, extension, demolition of existing buildings or parts of existing buildings;
- engineering works;
- earthworks;
- work of similar nature.
The requirements apply to fixed or moveable installations.